vin-number

Enter Your VIN:

Advertisement

SUZUKI GRAND VITARA XL-7

  • SUZUKI GRAND VITARA XL-7 2004

    ON CERTAIN PASSENGER VEHICLES, UNDER AMBIENT TEMPERATURES BELOW -25 DEGREES CELSIUS, MOISTURE CAN FREEZE IN THE FUEL PRESSURE REGULATOR. AS A RESULT, FUEL SYSTEM PRESSURE MAY INCREASE AT THE TIME OF ENGINE START UP, CAUSING FUEL LOSS AT THE FUEL PIPE/FUEL HOSE CONNECTION.

  • SUZUKI GRAND VITARA XL-7 2002

    ON CERTAIN PASSENGER VEHICLES, UNDER AMBIENT TEMPERATURES BELOW -25 DEGREES CELSIUS, MOISTURE CAN FREEZE IN THE FUEL PRESSURE REGULATOR. AS A RESULT, FUEL SYSTEM PRESSURE MAY INCREASE AT THE TIME OF ENGINE START UP, CAUSING FUEL LOSS AT THE FUEL PIPE/FUEL HOSE CONNECTION.

  • SUZUKI GRAND VITARA XL-7 2001

    ON CERTAIN PASSENGER VEHICLES, UNDER AMBIENT TEMPERATURES BELOW -25 DEGREES CELSIUS, MOISTURE CAN FREEZE IN THE FUEL PRESSURE REGULATOR. AS A RESULT, FUEL SYSTEM PRESSURE MAY INCREASE AT THE TIME OF ENGINE START UP, CAUSING FUEL LOSS AT THE FUEL PIPE/FUEL HOSE CONNECTION.

  • SUZUKI GRAND VITARA XL-7 2003

    ON CERTAIN PASSENGER VEHICLES, UNDER AMBIENT TEMPERATURES BELOW -25 DEGREES CELSIUS, MOISTURE CAN FREEZE IN THE FUEL PRESSURE REGULATOR. AS A RESULT, FUEL SYSTEM PRESSURE MAY INCREASE AT THE TIME OF ENGINE START UP, CAUSING FUEL LOSS AT THE FUEL PIPE/FUEL HOSE CONNECTION.

  • SUZUKI GRAND VITARA XL-7 2003

    ON CERTAIN SPORT UTILITY VEHICLES, THE IGNITION SYSTEM WIRING HARNESS IS ROUTED UNDER THE INTAKE MANIFOLD. THE HARNESS CAN RUB AGAINST THE MANIFOLD DURING VEHICLE OPERATION AND ABRASION DAMAGE TO THE HARNESS CAN OCCUR.

  • SUZUKI GRAND VITARA XL-7 2003

    CERTAIN PASSENGER (111 MY 2002 ESTEEM, 777 MY 2002 AERIO, 2,368 MY 2003 AERIO) AND SPORT UTILITY (324 MY 2002 GRAND VITARA, 274 MY 2003 GRAND VITARA, 684 MY 2002 GRAND VITARA XL-7, AND 781 MY 2003 GRAND VITARA XL-7) VEHICLES FAIL TO COMPLY WITH THE REQUIREMENTS OF FEDERAL MOTOR VEHICLE SAFETY STANDARD NO. 212, 'WINDSHIELD MOUNTING. THE WINDSHIELD MAY NOT BE PROPERLY SECURED TO THE VEHICLE BODY DUE TO INSUFFICIENT ADHESION BETWEEN THE PAINT APPLIED DURING THE SECOND-STAGE PAINTING PROCESS AND THE PAINT APPLIED DURING FINAL-STAGE PAINTING.